Nantong New Facility
Nantong New Facility Phase I Project was put into production on January 27, 2019, covering an area of 50 mu, with a total planned floor area of 60,000 m2; it has been equipped with 2 SMT lines, 1 selective welding line, and 2 fully automated assembly and testing lines; with 4 modular SMT lines, 3 se
|
Advanced Modern Manufacturing Systems
AGV automatic loading
AES auxiliary material traceability system
MES auxiliary material/quality traceability system
JES tooling/steel mesh/equipment system
HES job training arrangement system
EES ESD online monitoring system
TES temperature and humidity monitoring system
|
QC
Win customer satisfaction through the following methods:
Rigorous project execution Reduced COPQ Pursuit of zero defects Improved employees’ skills and sense of responsibility
|
Nantong New Facility Phase I Project was put into production on January 27, 2019, covering an area of 50 mu, with a total planned floor area of 60,000 m2; it has been equipped with 2 SMT lines, 1 selective welding line, and 2 fully automated assembly and testing lines; with 4 modular SMT lines, 3 selective welding lines and 6 automated assembly lines planned to put into operation; and with an estimated annual output of 6 million sets of automotive wireless charging, NFC, USB and other automotive electronic products. In addition, it also set up a 500 m2 reliability laboratory and a laboratory for research and development of new energy vehicle wireless charging.